Shandong Jufang New Materials Co., Ltd. plans to build 5000 tons/year high-performance aramid paper and supporting projects in the reserved land of Shandong Jingbo Holding Co., Ltd. According to the requirements of the notice on the issuance of the interim measures for public participation in environmental impact assessment issued by Huanfa [2006] No. 28, this announcement is hereby issued.
Name and Summary of 1. Construction Project
Project Name: Shandong Jufang New Material Co., Ltd. 5000 tons/year high-performance aramid paper and supporting projects
Project Summary: Para-aramid paper has excellent physical properties and is a key material for achieving light weight and high speed. In order to further extend the industrial chain of the enterprise, realize the efficient and stable production of para-aramid, thus breaking the monopoly of the United States and Japan on high-performance aramid paper, and paving the way for industrialization, Shandong Jingbo Jufang New Materials Co., Ltd. plans to invest 1 billion yuan to build 5000 tons/year high-performance aramid paper and supporting projects in the reserved land of Shandong Jingbo Holding Co., Ltd. The project is divided into two phases, the first phase is 1000 tons/year aramid products (300 tons/year aramid paper, 700 tons/year aramid fiber), and the second phase is 4000 tons/year aramid products (1000 tons/year aramid paper, 3000 tons/year aramid fiber).
The proposed project mainly builds NMP storage tank, PPD configuration kettle, TPC internal storage tank, neutralization kettle, twin screw reactor, paper making device, solvent recovery tower, decompression refining tower, dehydration tower, etc., fully relying on the existing public works and auxiliary production facilities of Jingbo Petrochemical.
Name and contact information of 2. construction unit
Construction unit: Shandong Jufang New Material Co., Ltd.
Unit address: Boxing County Chemical Industry Park, Shandong Province, in the reserved land of Shandong Jingbo Holding Co., Ltd.
Contact: Manager Zhang
Contact number: 18364931686
Introduction of Evaluation Institutions Undertaking EIA Work in 3.
Name of EIA Agency: Shandong Sea Menon Project Consulting Co., Ltd.
Shandong East China Sea Menong Project Consulting Co., Ltd. has Grade B qualification for environmental impact assessment of construction projects, certificate number: National Environmental Impact Assessment Certificate B Zi No. 2452; The evaluation content involves surface water, groundwater, gas, sound, solid waste, ecology, soil and water conservation, social economy, electromagnetism, human health, etc. The industry scope includes: environmental impact report category-light industry, textile and chemical fiber, chemical and petrochemical medicine, metallurgical machinery, building materials, thermal power, social services. Type of environmental impact report form-general project environmental impact report form; special type environmental impact report form.
Address of EIA Agency: Building 2, Lushang Guoao City, 9777 Jingshi Road, Lixia District, Jinan City
Zip Code: 250100
Contact: Li Gong
Tel: 0531-81795815 to 8025
E-mail: hp2ok@126.com
Working Procedures and Main Work Contents of 4. Environmental Impact Assessment
(1) The environmental impact assessment procedures of the Project are as follows:
① According to the national "Construction Project Environmental Protection Classification Management Directory", it is determined that the project should prepare an environmental impact report.
② Study national and local laws, regulations and standard documents related to environmental protection, study technical documents and other documents related to the construction project; conduct preliminary environmental investigation and preliminary engineering analysis.
③ Identify environmental impact factors and screen evaluation factors to determine the evaluation focus.
④ Determine the grade of each individual environmental impact assessment based on the investigation of the current environmental situation and the preliminary engineering analysis of the Project.
⑤ Use the current monitoring data to understand the current situation of regional environmental quality.
⑥ Evaluate the environmental impact of construction projects in accordance with national and local laws, regulations and standards.
⑦ On the basis of public participation in the investigation, the evaluation conclusion on the environmental feasibility of the construction project is given; the environmental protection measures and suggestions are put forward and the preparation of the report is completed.
(2) Main work contents of EIA:
① Engineering analysis.
② Investigation and evaluation of environmental status.
③ Environmental impact identification, evaluation factor screening and evaluation level determination.
④ Environmental impact analysis, prediction and assessment.
⑤ Environmental protection measures and their technical and economic demonstration.
⑥ Economic profit and loss analysis of environmental protection measures for the proposed project.
Carry out public participation surveys.
The development of environmental monitoring and management plan.
⑨ Give a definite conclusion on the feasibility of project planning from the perspective of environmental protection.
Main matters 5. soliciting public opinions
At present, the project is in the early stage of environmental impact assessment. In order to make the affected residents around the construction site better understand the project, this announcement is hereby issued. Residents are welcome to put forward valuable opinions and suggestions to construction units and environmental impact assessment units. The content includes the rationality of site selection, project construction content, suggestions on pollution prevention and control measures, corresponding project avoidance and public requirements for environmental protection departments for project approval.
Main ways of 6. public input
If the public has environmental protection opinions on the construction project, they can submit them to Shandong Jingbo Jufang New Materials Co., Ltd. and Shandong Donghai Minong Project Consulting Co., Ltd. within 10 working days from the date of this announcement. Feedback can be made by phone, Fax or email.
Announcement issued by: Shandong Jufang New Materials Co., Ltd.
Announcement release time: October 21, 2018